Committees
Board of Reviewers
Organizers
Sponsors
Preface
Home
 
Proceedings
1. Environmental Protection
2. Water Engineering
3. Sustainable Urban Development
4. Roads and Railways
5. Technologies of Geodesy and Cadastre
6. Energy for Buildings
 
 
Install Adobe Reader   In order to view articles you must have Adobe Reader installed
 
 
ISSN 2029-7092 online
ISBN 978-609-457-690-4 CD
ISBN 978-609-457-640-9
 Roads and Railways
 

Małgorzata Mostowska, Monika Gąsowska

Evaluation of the Metro C14 Stadium housing in Warsaw in Poland with FES use

Conference Information: 9th International Conference on Environmental Engineering, MAY 22-24, 2014 Vilnius, LITHUANIA
Source: ICEE-2014 - International Conference on Environmental Engineering
Book Series: International Conference on Environmental Engineering (ICEE) Selected papers
ISSN: ISSN 2029-7092 online
ISBN: 978-609-457-640-9 / 978-609-457-690-4 CD
Year: 2014
Publisher: Vilnius Gediminas Technical University Press Technika

View full text in PDF format

Abstract

In Warsaw the second line of the metro has been built since 2010. The Warsaw metro will consist of 7 stations. It will be built under the Vistula river. This elaboration deals with assessing the behavior of the deep excavation on the example of the Metro C14 Stadium housing in Warsaw. This elaboration deals with assessing the behavior of the deep excavation on the example of the Metro C14 Stadium housing in Warsaw. The calculation uses the results of tests carried out by the Consortium GEOTEKO-SGGW-GEOPROJEKT in 2003–2004 and 2007, as well as sections designed in the Office Projects Metroprojekt. Calculations were performed with using the Finite Element Method with the Plaxis 9.0 programe. The results were compared with each other and their analysis has been carried out.

Keywords: diaphragm wall; finite element method; excavation.

 
 
To the top